CobblewoodStart a project
Spent $31,200 of $42,000Contingency left $3,500

Keep a renovation on budget, from the first bid to the punch list.

Set a budget and a contingency, line up your bids, and log every payment against the line it belongs to. Cobblewood flags a line the moment it runs over, using only the numbers you enter.

$42,000Kitchen budget, example
A gutted kitchen at the framing stage: bare pine studs lit by a work lamp standing on the subfloor, sawdust on the floor, a tape measure hooked on a stud.

Your numbers, written down. Not an estimate.

Set the budget, then split it into lines.

Start a project with its total. Set a contingency aside for what nobody can see behind the walls, then break the rest into line items: cabinets, countertops, electrical, labor, permits.

Total budget
$42,000
Line items
$38,500
Contingency
$3,500

Example kitchen

$3,500
Kitchen, example$42,000
$3,500Contingency
Tap a line to open its log

Countertopsallowance $4,800, actual $6,200Example

Countertops log, example
DepositApr 2$2,400
Balance on installApr 30$2,400
Change order: thicker edge, extra cutoutMay 12$1,400

Your numbers, written down. Not an estimate.

Three bids, lined up line by line.

Bids that look far apart often cover different jobs. Enter each bid by line and Cobblewood sets them side by side, so a missing line shows up as bare wood.

Example: Bid 3 looks $6,200 lower, but it leaves out four of seven lines. Bids 1 and 2 are $650 apart once lined up.

Side-by-side comparison of up to five bids comes with Cobblewood Plus.

$650

Labor and trade bids, example

Three example bids lined up by line
LineBid 1Bid 2Bid 3
Demolition$1,800$2,100not included
Electrical$3,900$4,200$3,600
Plumbing$3,100$2,900$3,300
Drywall and paint$2,600$2,400not included
Carpentry and install$9,600$10,200$9,900
Permits$1,100$1,100not included
Haul-away$900$750not included
Total$23,000$23,650$16,800

Labor and trade bids, example. Bids rarely use your budget's lines; lining them up is the point.

Your numbers, written down. Not an estimate.

Log every payment against its line.

Deposits, progress payments, receipts and change orders each go on the line they belong to. You enter them yourself. Cobblewood never connects to a bank and never moves money.

The tape along the top keeps count as the example kitchen fills in.

$38,500

Kitchen log, example

Example payments logged against their lines
LineEntryDateAmount
Logged before May 6$31,200
CabinetsFinal paymentMay 6$2,840
ElectricalProgress paymentMay 7$1,950
PlumbingReceipt: fixturesMay 8$1,550
LaborProgress paymentMay 9$960
Line items, all logged$38,500

Your numbers, written down. Not an estimate.

A homeowner's gloved hands holding a tape measure across new plain cabinet boxes under a work lamp.

Hear about an overrun while there is still time.

When a line runs past its allowance, Cobblewood says which line, by how much, and what still covers it. The flag shows in the app and by email, the moment you log the entry.

$1,400

Countertops, example

Countertops are $1,400 over the allowance. Your contingency still covers it, with $2,100 left.

Allowance$4,800 +$1,400
Contingency$2,100 left of $3,500
The entry that raised the flag, example
Change order: thicker edge, extra cutoutMay 12$1,400

Your numbers, written down. Not an estimate.

When the dust settles, see what it really cost.

Close out the project and Cobblewood writes up the final cost report: every line's budget next to what it cost, what the contingency covered, and what was left over.

The exportable final cost report comes with Cobblewood Plus.

$39,900

Final cost report: kitchen, example

Closed out May 30
Budget
$42,000
Final cost
$39,900
Left in contingency
$2,100
Budget against actual cost for each line, example
LineBudgetActualDifference
Cabinets$14,200$14,200on budget
Countertops allowance$4,800$6,200over by $1,400
Electrical$3,900$3,900on budget
Plumbing$3,100$3,100on budget
Labor$9,600$9,600on budget
Demolition$1,800$1,800on budget
Permits$1,100$1,100on budget
Line items$38,500$39,900over by $1,400
Contingency$3,500$1,400 used$2,100 left

Your numbers, written down. Not an estimate.

What Cobblewood never does.

Three lines it will not cross, written down where you can hold it to them.

Not on this job

  • Refer contractors

    Cobblewood never recommends, rates or matches contractors, and never vouches for a bid. You choose who does the work.

  • Offer financing

    No loans, no lenders, no financing offers. Cobblewood is a budgeting tool, not a lender or an advisor.

  • Touch the money

    No bank connections and no payments. You enter your own bids, payments and receipts; Cobblewood does the arithmetic.

Free for one project. Plus when the job grows.

Free tracks the spending. Plus helps you choose the contractor and keep the whole project honest.

Compare the plans in full

$7

Free

$0

Run one project start to finish.

  • One active project
  • Total budget and contingency
  • Line items
  • Payment and receipt log

Cobblewood Plus

$7 a month

or $60 a year

  • Everything in Free
  • Unlimited projects
  • Side-by-side comparison of up to five bids
  • Change-order log
  • A shared project with a partner
  • Exportable final cost report
Start a project

Free costs nothing. Plus, if you choose it, bills $7 each month.

Plain guides for before the first bid.

Allowances, contingencies, change orders and bids, explained in plain words. No statistics, no sales pitch.

All guides

Start with one project, free.

Put down the budget you have and the bids you have in hand. Cobblewood keeps the lines, the log and the flag from there, measured twice and written down.

A flat carpenter's pencil resting on a stud's top plate beside small pencil tick marks, dust in the lamp light.

Your numbers, written down. Not an estimate.